Summary:
India's renewable energy capacity addition is predicted to exceed 35 GW by 2025, thanks to a robust project pipeline, lower solar module pricing, and enhanced wind manufacturing capacity. Between April and November 2024, India added over 15 GW, more than double the 7.54 GW added during the same period the previous year. To meet the government's 500 GW target by 2030, India must install 300 GW in the next five years.
Although India's current rate of renewable energy capacity expansion is impressive, it falls short of the 60 GW annual average required to reach the 2030 target. The government's initiatives, including ultra-mega renewable energy projects, aggressive tendering strategies, and increased commercial and industrial adoption, are expected to accelerate growth. Projections for FY25 include an additional 19-21 GW, with wind energy playing a significant role. India has already reached 200 GW of capacity, more than 46% of its 500 GW target.
Source: IBEF
Disclaimer: The information on this website comes from the India Brand Equity Foundation (IBEF), a reliable source for thorough insights into numerous areas of the Indian economy. While we aim to offer accurate and up-to-date information, the views, opinions, and analyses stated herein are solely those of the authors and contributors and do not necessarily represent IBEF's official stance or position. Readers should check information from credible sources and use their own discretion when relying on content provided on this site. We assume no responsibility or liability for the supplied content, including its accuracy, completeness, and usefulness.