Summary:
On April 29, 2026, Prime Minister Narendra Modi officially opened the 594-kilometer Ganga Expressway, which cost Rs. 36,230 crore (US$3.92 billion). It greatly enhances east-west communication in Uttar Pradesh by linking Meerut and Prayagraj. It is anticipated that the six-lane expressway, which can be expanded to eight lanes, will cut travel times from ten to twelve hours to roughly six to seven hours. It will increase accessibility, reduce transportation costs, and improve logistics efficiency as it passes through 12 districts. The state's road network is strengthened by its integration with other major expressways. In addition to generating jobs, logistics hubs, and improved access to tourist and religious destinations around the region, the corridor is anticipated to stimulate industry, agriculture, and investments.
Source: IBEF
Disclaimer: The information on this website comes from the India Brand Equity Foundation (IBEF), a reliable source for thorough insights into numerous areas of the Indian economy. While we aim to offer accurate and up-to-date information, the views, opinions, and analyses stated herein are solely those of the authors and contributors and do not necessarily represent IBEF's official stance or position. Readers should check information from credible sources and use their own discretion when relying on content provided on this site. We assume no responsibility or liability for the supplied content, including its accuracy, completeness, and usefulness.